Wind exhaust pipe and exhaust fan |
Galvanized iron sheet |
Fire resistance testing chamber |
Stainless steel, includes inspection window, wind leading structure and etc |
Burner |
Favorable drainage structure |
|
Control, display and others circuit systems |
|
Includes temperature measure system |
Water supply system and temperature control system |
The system includes heating water system, mixed water tank, high temperature gas-liquid pressurization cylinder and water return line and control valve and etc.(can add cold water circulating system independently) |
The pipe fitting of the water circulation channel testing |
Shall be thin-walled pipe provided by suppliers.(in principle, it is according to the maximum specimen specification) |
The pipe material (including fittings) of the site construction |
Shall be prepared by the demander according to the final construction drawings of the supplier |
Additional four specifications |
(26.9mm, 48.3mm, 88.9mm, 159mm) are provided for each of the pipe materials of about 600mm, which is for the supply side to make the replacement joints. |
Water exhaust system |
The equipment has the design of leaking water containing and exhausting. |
The part from the device drain |
(1' pipe joint) to the drain part is responsible by the demander |
Power supply system |
please refers to the technical parameters for the device power supply specifications of this device. The demand side should install a power source box next to the device |
Fireproof, flame extinguishing and safety alarm system |
However the system is not responsible for the hazard of material toxicity which may occur when the test is damaged and failure occurs, and the system does not undertake the dangerous accident in safe pressure under standard instructions when the sample is damaged and something is wrong in the testing process. |