• One Station Single Phase Tester Breaker Tripping Performance Test/Testing Machine
  • One Station Single Phase Tester Breaker Tripping Performance Test/Testing Machine
  • One Station Single Phase Tester Breaker Tripping Performance Test/Testing Machine

One Station Single Phase Tester Breaker Tripping Performance Test/Testing Machine

Warranty: 12 Months
Test Number: 1-99 Time
Station: One
Test Turn-on Time: 0-24h
Cold State Connect Time: 0-120min
Hot State Connect Time: 0-120min
Customization:
Manufacturer/Factory & Trading Company
Gold Member Since 2018

Suppliers with verified business licenses

Guangdong, China
Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Cooperated with Fortune 500
This supplier has Cooperated with Fortune 500 companies
Years of Export Experience
The export experience of the supplier is more than 10 years
to see all verified strength labels (30)

Basic Info.

Model NO.
SH9463C
Function
Breaker Tripping Testing
Delivery
Within 10-40 Working Days After Order Confirmed
Shipment
Ocean or The Customer′s Requirement
Transport Package
Wooden Box
Specification
1000*900*1100mm
Trademark
Sunho
Origin
China Mainland
HS Code
9031809090
Production Capacity
1500 Set Per Year

Product Description

One Station Single Phase Tester Breaker Tripping Performance Test/Testing Machine

1. Product Description

It is designed according to the standard requirements of IEC60898, applied to 28 days experiment of breakertime-current characteristic testinstantaneous tripping test.

2. Standards

IEC60898




3. Technical Parameters

Power supply AC220V 50Hz, power supply instantaneous power is about 25KVA, resistance power is about 20kw
  Rated current and tripping test current of each test item is set according to the relevant standard requirements
Test turn-on time 0-24H(settable), test periodic time: 0-24h(settable)
Test number 1-99 time (settable)
Station one
Single phase single circuit load load rated current is 5-63A, tripping current is 10-630A, voltage AC: no more than 30V.
  Days test: automatic record the temperature before testing and the temperature of the connect terminals at the last electrify. After measuring the temperature, the current will be conducted in 5s
  A set of vertical mounting rack, include 20mm black paint pressing plate.
Cold state connect time 0-120min
Hot state connect time 0-120min
  Automatically make the time-current characteristic diagram
The time tripping should conducted and should not conducted 0-120min
Time precision ±1S
  Automatically conclude whether the tripping time and shouldn't tripping time are accordance with the requirements.
  Instantaneous tripping test adopts displaying oscilloscope and computer (prepared by user). 
 
One Station Single Phase Tester Breaker Tripping Performance Test/Testing MachineOne Station Single Phase Tester Breaker Tripping Performance Test/Testing MachineOne Station Single Phase Tester Breaker Tripping Performance Test/Testing MachineOne Station Single Phase Tester Breaker Tripping Performance Test/Testing MachineOne Station Single Phase Tester Breaker Tripping Performance Test/Testing MachineOne Station Single Phase Tester Breaker Tripping Performance Test/Testing MachineOne Station Single Phase Tester Breaker Tripping Performance Test/Testing Machine

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now