• Lab Equipment Cycle Tester for Switching Order of Toasters
  • Lab Equipment Cycle Tester for Switching Order of Toasters
  • Lab Equipment Cycle Tester for Switching Order of Toasters
  • Lab Equipment Cycle Tester for Switching Order of Toasters

Lab Equipment Cycle Tester for Switching Order of Toasters

Warranty: 12 Months
Counting Range: 1~999999
Materials: Stainless Steel
Test Station: One
Function: Cycle Tester for Switching Order of Toasters
OEM/ODM: Accepted
Customization:
Manufacturer/Factory & Trading Company
Gold Member Since 2018

Suppliers with verified business licenses

Guangdong, China
Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Cooperated with Fortune 500
This supplier has Cooperated with Fortune 500 companies
Years of Export Experience
The export experience of the supplier is more than 10 years
to see all verified strength labels (30)

Basic Info.

Model NO.
SH9841
Delivery
Within 10-40 Working Days After Order Confirmed
Shipment
Ocean or The Customer′s Requirement
Company Type
High-Tech Enterprise, Manufacturer & Trader
Transport Package
Wooden Box
Specification
1000*800*1200mm
Trademark
Sunho
Origin
China Mainland
HS Code
9031809090
Production Capacity
1500 Set Per Year

Product Description

IEC60335 Lab Equipment Cycle Tester for Switching Order of Toasters

1. Product Description

It is designed according to the relevant standard of IEC 60335-2-9:2004, Article 19.101. Is the tester to simulate the toaster with no-load and load test equipment.

Under the no-load and the stated rated power conditions, to carry on the six Continuous cycle operation at one time(when it finished the test, press the start again to repeat the cycle test).

Forced ventilation shall be used to cool the unit up to room temperature,Number of repetition of 500 times of the cooling process to make it cooling to the room temperature.

Under the load and the stated rated power conditions, using the different specifications toaster to check whether the ejection mechanism can be action test, and after set cycle of the timer is finished to check whether the heating element is still switched on.


2. Standards

IEC 60335




3. Technical Parameters

Power supply AC220V,50Hz,can order the other specifications
Counting range 1~999999
Test station one
  Including smart controllers, counters, activation mechanism, sensors, temperature testing, and so on.
  Equipment with automatic repeat start, count and temperature discriminant function. Can be separately set the on time(1-10min), off time(1-10min), and the cooling time(1-60min).
Smart discriminant function When the switch bonding occurs with continuously turned on or off, you can set and when it reached to the set number, it will alarmed.
  When power failure occurs while the unit runs, number of cycles shall resume to be counted and shall need to be reset upon power connection.
  The unit may be operated unattended, and when any damage or short circuit occurs in connection contacts or number of cycles set, the supply circuit.
Lab Equipment Cycle Tester for Switching Order of ToastersLab Equipment Cycle Tester for Switching Order of ToastersLab Equipment Cycle Tester for Switching Order of ToastersLab Equipment Cycle Tester for Switching Order of ToastersLab Equipment Cycle Tester for Switching Order of ToastersLab Equipment Cycle Tester for Switching Order of ToastersLab Equipment Cycle Tester for Switching Order of Toasters

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now